Renewable energy solutions for a sustainable tomorrow

How a typical engagement moves from first site visit to handover

Every project follows the same sequence, whether it is a single inverter replacement or a full plant commissioning. The dates below are realistic for a medium-sized distributed PV installation in South Africa, but the actual timeline depends on municipal approval lead times and how quickly the client's team responds to technical queries.

Week 1-2

Site assessment and data collection

We walk the plant with your team, log inverter fault codes, check string voltages at the combiner boxes, and review the last three months of performance ratio data. You get a written summary of findings within five working days, including photos of any switchgear issues we spot.

Week 3-4

Scope definition and municipal paperwork

Once the fault list is agreed, we prepare the scope of work, including any grid compliance documentation required by the local municipality. For larger plants this means protective relaying coordination studies and updated single-line diagrams. We handle the submission and track the application until approval comes through.

Week 5-8

Field work and corrective maintenance

This is where the actual repairs happen: replacing faulty DC switchgear, clearing inverter faults, re-torquing connections, and thermal scanning of combiner boxes to catch hot spots before they become failures. We work during daylight hours only and follow a documented lockout-tagout procedure for all DC work.

Week 9-10

Performance verification and reporting

After the work is complete, we run a full performance check: string-level I-V curves, inverter efficiency at different irradiance levels, and a comparison of pre- and post-maintenance performance ratio. You receive a close-out report with the measured data and a list of recommended follow-up actions.

Week 11-12

Handover and documentation pack

The final handover includes as-built drawings, updated maintenance schedules, and a plain-language summary of what was fixed and why. We also walk your team through any changes to inverter settings or battery dispatch logic so they know what to expect during normal operation.

Field support when the plant is down

Most of our work happens on site, but a lot of problems get solved faster over the phone. We keep the same engineers who write the reports available for direct calls, so you are not explaining your inverter fault to a helpdesk agent who has never opened a combiner box.

Response times depend on the severity of the issue and your service level agreement. For urgent faults that affect production or safety, we aim to respond within two hours during business hours. For general technical questions and documentation requests, expect a reply within one working day.

Technical support line

For urgent inverter faults, string trips, or grid compliance questions during business hours. Call us directly and ask for the O&M engineer on duty.

0158673625

Email for documentation

Send performance reports, fault logs, or municipal approval queries. We log every request and keep the thread attached to your plant file.

info@adanirenewables.com

SLA expectations

Our standard support hours are Monday to Friday, 07:00 to 17:00. Critical safety issues get priority response regardless of the channel you use. For non-urgent questions, we batch responses at the end of the day so the engineer has time to check the actual data before replying.

If you are not sure whether your issue qualifies as urgent, send a photo of the fault code and the inverter model. That usually speeds things up.

Common questions about response times and fault reporting are covered in the FAQ section. Browse the knowledge base

How a typical engagement runs

Every site has its own quirks, but the workflow stays consistent. Here is the sequence we follow from the first call to the final handover, so you know what to expect and where you can step in.

1

Site data and fault logs

We start with what you already have: inverter fault history, string voltages, PR data from your monitoring platform, and any recent maintenance reports. If you have a specific trip or error code in mind, that shortens the diagnosis considerably.

You send us the raw files or grant read-only access to your monitoring dashboard. No need to clean anything up beforehand.

2

Desk review and checklist

Before anyone climbs on a roof or opens a combiner box, we work through the likely causes on paper. This covers string sizing checks against your module datasheets, review of protection relay settings, and a look at the as-built drawings.

You receive a short written summary of what we found and what we plan to verify on site.

3

On-site inspection

A scheduled visit to physically check the equipment. This is where we do thermal scanning of combiner boxes, verify DC switchgear condition, measure string currents, and inspect bifacial module soiling patterns.

We work around your operational hours and follow your site safety induction. Typical visits run half a day to two days depending on plant size.

4

Findings report

Within a week of the site visit you get a plain-language report. It lists each issue with a photo or measurement where relevant, explains the likely impact on performance or compliance, and ranks fixes by urgency.

No jargon for its own sake. If a fault code points to a specific component, we say so directly.

5

Remedial work or guidance

Depending on what we found, we either carry out the corrective work ourselves or hand you a clear set of instructions for your own maintenance team. This includes reset procedures, cleaning schedules, and any adjustments to string configurations.

For grid compliance items, we also flag the relevant municipal or Eskom paperwork so you are not caught out during an audit.

6

Follow-up verification

After the fix is in place, we check that the plant is actually performing as expected. This might be a remote review of your monitoring data over a few weeks, or a short return visit to confirm the issue is fully resolved.

You get a short close-out note so there is a clear record for your files or for the next annual inspection.

Not sure which stage applies to your situation? Read about the approach we take on fault diagnosis or see the full range of maintenance services we offer.

Cookie settings

We use cookies to keep the site reliable, remember basic choices, and understand which pages are useful. You can accept, reject, or review the settings before continuing.